description: | Working Alongside Regular Traffic, A Cn Rail Crew Lays A 77 Metre Track Switch Assembly So Trains Can Move From Single To Double Track At Tranquille, Bc. Cn Rail'S 13.5 Kilometre Double-Track Section From Tranquille To Kamloops Is The First In North America To Be Constructed Using Concrete Ties And Continuous Welded Rail |