description: | Dimensions Of The Work Cuts And Fills Were Marked On The Ground By The Railway'S Engineers By Setting Slope Stakes At The Correct Width From The Centre Line And Showing The Depth To Be Cut Or Fill To Be Built Up At Each Respective Point In Alberta. |